RENT A
DISCHARGER
A feedstock peak, a proof of concept, a test site,… sometimes buying equipment is not the best option. Renting a RE-GEN 90M gets a full battery and module discharger on-site way faster.
One fixed fee per month. Maintenance included. It runs as opex, not capex.
A MULTI-PURPOSE DISCHARGER
One system, two jobs
The RE-GEN 90M discharges full HV battery packs and individual modules from the same unit. No separate machines, no swapping equipment between jobs — one rental covers whatever comes through the door.
Modular by design. Scale the module side up to 24 channels as volume grows, without touching the battery discharge side.
Built for throughput
90 kW rated power. Up to 96% peak efficiency on battery packs, 92% on modules. Every cell drained to 0V and the recovered energy pushed back into your grid instead of burned off as heat.
That's the difference between a discharger that keeps up with your line and one that becomes the bottleneck.
Any feedstock, no problem
Packs and modules rarely arrive in a predictable state. The RE-GEN 90M covers 0–950V on batteries and 0–100V on modules, with anti-reverse and overvoltage protection built in, so a wide and unpredictable feedstock mix stays a non-issue.
FLIR® thermal imaging watches every discharge live and adjusts power to the thresholds you set.
RE-GEN 90M: PACKS AND MODULES
One system that covers both ends of the job: the RE-GEN 90M discharges full HV battery packs down to 0V and, in parallel, runs up to 24 individual module channels from the same unit, no second machine, no reconfiguring between a pack that just came off a wreck and a tray of loose modules pulled from storage.
Its input range stretches from 950V on the battery side to as low as 0.1A at the tail end of a module discharge, with current handled anywhere from 220A down to a trickle, so a pack at near-full charge and a module that's already half-drained both get discharged safely on the same equipment, back to back.
That range is what makes an unpredictable feedstock a non-issue rather than a sorting problem: whatever chemistry, state of charge, or pack format shows up on a given day, the 90M flexes to it instead of forcing you to triage first and discharge second.
Rated power
90 kW
Dischargre voltage range
950V to 0V (Battery packs)
100V to 0V (Modules)
Peak efficiency
96% (Battery packs)
92% (Modules)
Discharge current range
220A to 0.1A (Battery packs)
100A or 200A to 0.1A (Modules)
Thermal monitoring
FLIR® AX8 integrated thermal camera
Learn about our prices
A fixed monthly fee, maintenance included, no separate service contract to negotiate. Choose the term that matches the job: 6, 12, 18, 24 months or longer — swap to a purchase later if the pilot turns permanent.
Trusted by